17.01.2012
Straton for LEGODiscover Straton package for LEGO Mindstorms NXT 2.0, a full automation in a fun environment[more] Category: News HOME, News product, News Workbench, Success Story
06.01.2012
New features in versions 8.2Keep on innovating with more features available in straton 8.2[more] Category: News HOME, News product, News Workbench
07.12.2011
POWERLINK Master ControllerAdvantech and Copalp present New POWERLINK Master Controller[more] Category: News product, News HOME, News partners
30.05.2011
Straton SCL EditorPerforming and easy to use assistant to create ICD and CID files dedicated to IEC 61850 standard Category: News HOME, News product, News Workbench
05.11.2010
straton 8.1 Now AvailableDiscover the new features of the straton 8.1 environment[more] Category: News product, News Workbench
|
![]() To satisfy the growing demand of information in the sector of the energy, electric substations require protocols and applications of control more and more complex. All the primary and secondary equipments such as electric transformer, electric autotransformer, circuit breaker at high voltage, etc. are concerned. COPALP develops a range of components supplying the basic features of these equipments and simplifying the configuration of the standard industrial protocols:
ENERGY STANDARDS AND COMMUNICATION PROTOCOLS![]() Automation systems need to provide more and more information to the control room and SCADA system. The opening of the energy industries request some new standard to send, received information and also provide standard mechanism for each component. These is achieved using the communication standard and energy standard DNP3, IEC60870-101, IEC60870-104, IEC 61850, IEC61400.
CONTROL/COMMAND and IEC61131-3![]() The IEC61131-3 is a reference for any automation application. Today no application is implemented without the use of these languages. With straton you can easily with a convenient environment develop such application. More than that, straton includes a lot of useful libraries that reduce the development time. The project automation capability of straton is a simple way to develop quickly your project. Some import tool and/or generation of application program can be easily integrated in straton.
REDUNDANT and SECURE application![]() Security is an issue in energy distribution. RTU and BCU should provide an efficient way to secure the application. The capability to provide solutions that enable the redundancy of the main controller of sub-station is not only a requirement but mandatory. In the same spirit the communication protocol can be redundant in few clicks.
DISTRIBUTED APPLICATION![]() Energy projects integrate more and more features. This is achieving using a main automation system but it is also important to keep some logic close to the process using a distributed application. The straton Integrated Development Tool contains a wide range of tool to manage several platforms, to communicate with other platforms, to simulate, to download/upload programming and configuration data and to make debugging and commissioning of your application.
REDUCING THE PROGRAMMING AND CONFIGURATION TIME![]() The development time is an important issue in energy market. Reducing the number of tools and the complexity to configure an application is a first step to win some time. But the reliability of the application and capability to update /maintain legacy application is an issue for long term solution as in energy. With the integrated solution straton/zenon COPALP answer to these requirement and even more due to the energy features of zenon (Redundancy, protocols IEC61850/870, DNP3). Topology management is fully integrated. The use of a unique database for both tools straton and zenon reduce the configuration time as client/server configuration is done once.
|