|
18.03.2013
straton 8.5 Now Available!
Discover the new features of straton 8.5![more] Category: News product, News Workbench, News HOME
READ MORE
18.03.2013
Straton for DLMS/ COSEMIt is now easy to communicate with a Smart Metering system, a dispatch center (IEC60870), a substation (IEC61850), a wind farm (IEC61400), a solar panel power plant and with any automation components Category: News product, News HOME, News communication
READ MORE
17.12.2012
New runtime for NXT
Have fun using the new Straton for NXT that includes drivers for Energy Meter and Microcontroller PCA8574, remote 8-bit I/O expander for I2C bus! Category: News HOME, News product
READ MORE
02.10.2012
Open Power Link integration in StratonNot just an additional Realtime Ethernet protocol but a pathway to greater flexibility Category: News product, News HOME, News communication, News Workbench
READ MORE
01.10.2012
zenon Challenge 2012
The winners of the zenon Challenge 2012 with their winning project SynergyRGB (from left to right): Jarosław Gawryluk, Wojciech Gregorczyk und Paweł Kowalik der Firma Synergy Polska.[more] Category: News product, News Workbench, Success Story, News HOME
READ MORE
|
ICE 61131-3 Development Environmentstraton Integrated Development EnvironmentThe straton Integrated Development Environment includes several tools as a fieldbus configuration tool, a analog signal editor and editors compliant with the five languages of the IEC 61131-3 Standard: Sequential Function Chart (SFC), Function Block Diagram (FBD), Continuous Function Chart (CFC), Ladder Diagram (LD), Structured Text (ST), Instruction List (IL).
Very powerful tools are provided for online debugging and simulating the IEC 61131-3 application. The Log window displays all run time messages sent by the target or by the simulator when testing the application. During step by step debugging, the Log Window also shows the current call stack and the list of installed breakpoints.
In order to reduce the cost of solutions, applications for industrial control need to be built within short time. This can be achieved by reducing the time of programming and the time of configuration the industrial control project. To reach this goal COPALP enhanced the straton product with the project automation. This tool gives the possibility to generate a part or entire application from a third party application.
|







